Just had a well drilled with a PVC casing; for lightning protection, driller said to tap into the ground wire at the well head and run the tap to a driven ground rod near the well head.
In other words, the ground wire from the service panel is to go to a driven ground rod located near the well head and then continue on down the well to the pump ground.
Does this sound right ?
In other words, the ground wire from the service panel is to go to a driven ground rod located near the well head and then continue on down the well to the pump ground.
Does this sound right ?