Homeownerinburb
Member
Here's one that is new on me:
Just walked thru a modest job that requires replacing two 4"sq boxes with three gang.
Apparently the building is built of steel studs.
I want to do the least damage possible.
What do you think I will run into, and how can I do this cleanest?
Just walked thru a modest job that requires replacing two 4"sq boxes with three gang.
Apparently the building is built of steel studs.
I want to do the least damage possible.
What do you think I will run into, and how can I do this cleanest?