When setting up a vfd on a well pump for a cabin in the mountains what would it take. I am wanting to install a system that could be ran with a generator only to supply a cystern with a level control to start the generator and then the pump. I want to control the start up from actually be hammered with the power supply. Also I was wondering if it would take a soft start. Any direction would be really appreciated.