Everyone,
Due to windows I have to drill a 2" drain hole thru the middle of a 2x12 joist to set my tub drain. Before I do, is it okay to run the drain at a 90 degree angle ( long sweep ) on the arm for the p-trap before heading to the vertical vent/waste? It's less than 2 feet each way. See pic...
Thanks for the advice!
Due to windows I have to drill a 2" drain hole thru the middle of a 2x12 joist to set my tub drain. Before I do, is it okay to run the drain at a 90 degree angle ( long sweep ) on the arm for the p-trap before heading to the vertical vent/waste? It's less than 2 feet each way. See pic...
Thanks for the advice!