You've got your order of operations slightly upset...it will be almost impossible to get a perfect surface to set your tub on if you let it cure before you set the tub...so, put some piles, strategically placed where they'll support things, throw down the plastic (it doesn't hurt to have some on the floor before throwing the piles down - this helps keep the subflooring from absorbing too much water from the mix - concrete products cure, and incorporate the moisture into their crystalline structure...it doesn't dry), and then mush the tub into it while looking at the level(s) so you have it perfectly level and at the height you want.





Reply With Quote
Bookmarks