I bought a new home two years ago. The builder was going to finish the basement, and the house was already framed and roughed in with the concrete poured. Given that he was planning on finishing the basement, but I asked him not to; I assume the rough in is correct for the basement bathroom.
Here's my question, I want to finish the basement, including the bathroom, but I'm not 100% sure about a couple of things. I'll hire a plumber if I have to, but I prefer to DIY whenever I can (I like the chance to learn something new).
I plan on putting a shower in at the back, then the toilet, then a sink. Not shown is a 2" vent line coming from the ceiling, roughly above the sink location.
I plan on connecting the sink and the shower to the vent line and call it good. I'll need to put a trap under the sink of course, and there is a P trap under the gravel where the shower is to be.
Other then not being certain of what's under the concrete (going on faith that the builder did it correctly), does anyone see any show stoppers?
Steve
Here's my question, I want to finish the basement, including the bathroom, but I'm not 100% sure about a couple of things. I'll hire a plumber if I have to, but I prefer to DIY whenever I can (I like the chance to learn something new).
I plan on putting a shower in at the back, then the toilet, then a sink. Not shown is a 2" vent line coming from the ceiling, roughly above the sink location.
I plan on connecting the sink and the shower to the vent line and call it good. I'll need to put a trap under the sink of course, and there is a P trap under the gravel where the shower is to be.
Other then not being certain of what's under the concrete (going on faith that the builder did it correctly), does anyone see any show stoppers?
Steve