I searched this forum b-4 posting but could not find a similar question.
My 48X48 3/4" subfloor is out of level 5/8" from right side (exterior wall). The level is consistent for the extire 48" run. I am planning on adding a second layer of 3/4" exterior plywood as additional sub floor support before installing the Schluter pan.
Question. 1) Should I level the floor between the two sheets of plywood using self leveler? or thin set?, - basically sandwiching the leveler b/tween the ply or, 2) Install the ply to the ply and level the top and then thin set the pan in place.
(If Thin set is better, I'd like to use that since I have enough already. However, no problem using a poured self leveler as I am planning radiant heat flooring too.
Thanks in advance for any help
My 48X48 3/4" subfloor is out of level 5/8" from right side (exterior wall). The level is consistent for the extire 48" run. I am planning on adding a second layer of 3/4" exterior plywood as additional sub floor support before installing the Schluter pan.
Question. 1) Should I level the floor between the two sheets of plywood using self leveler? or thin set?, - basically sandwiching the leveler b/tween the ply or, 2) Install the ply to the ply and level the top and then thin set the pan in place.
(If Thin set is better, I'd like to use that since I have enough already. However, no problem using a poured self leveler as I am planning radiant heat flooring too.
Thanks in advance for any help