Do a disposal and DW HAVE to be on separate circuits? I have 2 circuits allocated for them, but one has plenty of capacity to run both. Can I simplify and run both off the one?

Also, Can the NM cable just come thru a hole in the sheetrock into the area where the sinkbase will be and after the sinkbase is installed, put a JB inside?

Thanks

-Jay