The drawing would make my inspector happy.
Whether you can plumb it that way in the house remains to be seen.![]()
|
|
|
Anyone see a problem with my riser diagram? Full bath on main floor and second floor stack tie into main trunk line with 4" wye's. Redoing all the plumbing as it was originally CI with threaded galvanized. No flat vents in this design. All DWV is sch 40 PVC.
Thanks
The drawing would make my inspector happy.
Whether you can plumb it that way in the house remains to be seen.![]()
Huh?
There is nothing wrong with that drawing. I concur with the above statement. Good job.
You don't need 4" anywhere there
No, plumbing ain't rocket science. Unlike rocket science, plumbing requires a license!
Existing sewer is 4"CI coming up out of the floor. Could save a few $ but I'm going with 4" all the way through.
Pretty sure it will fit this way as I have a lot of it in already.
Bookmarks