
Originally Posted by
DanMcD
Great and thanks. That was the attachment I was trying to send but I could not make it work.
John, also....below is the other info I got from Peter Beckmann, in addition to his attachment info that you just provided:
----
Hi Dan,
Thank you for your interested.
You want to cut out a notch on the back side of the wedi board, apply a continuous bead of wedi joint sealant to the inside of the tub flange and install the wedi board to the framework, so that the tub flange is integrated into the wedi board. wedi board can be installed down to the actual tub edge the tub edge leaving only 1/8” gap to alow for movement. Wedi board cannot wick water unlike fleece/paper laminated foam boards, gypsum or cement boards. It will fully back your tile all the way down to the edge of tub. Plumb, Square and tight corners are the result of the tub flanges safe integration into the wedi board. see the tub surround Kit TDS attached – It shows the installation method in detail
Please let me know if you have any further questions.
Thank you and have a great day
Peter
Sincerely,
Peter Beckmann
Technical Support Manager Midwest/Center
Bookmarks