But wait, there's more... for $1000.00 I get:
-New pump and motor, I asked what brand will he installed; he named myers, goulds, etc...
-New PVC pipe (4 sections max, I counted the fitting on existing line and found two adapters).
-Probably reused existing down hole wire.
-Reused existing well seal.
-No control box.
-No new Pressure Switch.
-I have to take a day off work to help.
Due to the tough economy, he can do it for $800.00 to help me out. I asked if he heard of CSV valve, don't need it because the tank and the pressure switch control the pump. I didn't push the subject.
Question concerning piping, PVC or Poly? To lower 60' or 80' of PVC pipe seems difficult due to flexibility of the pipe. Thought?
I'm still looking for motor, any suggestions where to look?
The motor is Franklin Electric 1 HP, 230V, 8.2 Amp, Single Phase, 2 wire. Model 2445089003