Pensotti R series positive draft over fire

Users who are viewing this thread

Mazzy

New Member
Messages
1
Reaction score
0
Points
0
Location
Long Island, N.Y
I just serviced a Pensotti R series...I think it's an R series. It had the man on the front case and it's on the older side. The front casing pulls off and the two bolt access door is on the front of the boiler.

I cleaned out the flue passages and removed the smoke pipe from the back of the boiler and vacuumed that out. I have a positive draft coming from the viewing hole. Is there another access to clean out the boiler that I missed. The breech draft is -.03.

Thanks,
Maz
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks