Brett bates
New Member
Are you required to pull a permit when paralleling an existing system. I have three bathrooms that need the water piping replaced but no relocation of fixtures and no additional fixtures to be added. Also we will not be replacing the service line. I am looking for the code # in UPC that I can show to the building official that a permit is not required for paralleling an existing system