Yes, those were the two bullets I noticed when I looked through the manual. I just reread it, and I've got it now. I've decided to stick with my plan to install the two 20-amp circuits:
- Circuit #1: Two GFCIs
- Circuit #2: Floor heat, downstairs bathroom fan and lights






Reply With Quote
I remember reading something about a 3-hour continuous load, and only the deck light would be on continuously for 3+ hours. I believe I have 5 open slots in the panel (although, it's only a 60-amp panel - that's another issue I'll have to deal with later), so I could run three new circuits. 
Bookmarks