I had a 2" well drilled. The driller put a pvc cap on it since I was going to finish it out later myself. The cap was on for the last few months. I bought the packer assembly, foot valve, SRA's etc. I was told I needed a 1 1/4" foot valve. When I went to drop the piping into the well the foot valve would not go. It was too big. Is this the correct size foot valve for a 2" well or could the cap possibly have had some effect on the pipe?
The well piping is lettered with green lettering & says 2" jet pipe, or something similar to that wording.
The well piping is lettered with green lettering & says 2" jet pipe, or something similar to that wording.