Chad Schloss
Member
Well, I have been waiting to do this for awhile now. I am rehabbing the entire house, so this has been on a list of mine for some time now. I still need to run the lines from the far end of the house for the kitchen sink and washing machine drain. They will tie into the 4" cleanout heading out to the main drain. I have relocated a 4" cleanout on the left side of the double wye. Ontop of the wye sits the toilet, which i have to stub up yet. The right side of the wye accepts the drains from the tub and the bath vanity. I hope I got this right. I tested it all, no leaks overnight, tub drains nice and fast. 1.5" from tub drain to 2" p trap, 2" the rest of the way until the 4" wye. 2" vent continues from the vanity thru the roof, and exits the roof with 3" pipe. Let me know what you think HJ and others. Thanks