Mikeygstl
New Member
hard to describe, so I scetched it up. Basically, I want to know if this vent routing highlighted in red is okay. I am tying into an existing 2" horizontal vent, which currently vents a laundry sink. This vent currently comes out of the slab, ties into a 1.5" line for the laundry, then continues up and onto a ledge where brick meets stone foundation, along ledge for 11' or so, then turns vertical to tie into a 4" stack above a half bath on the first floor.
The ground rough for the full bath in the basement already exists, and is shown in sketch.
From what I am reading in the IRC, there is nothing I can find that specifically disallows a vent going up, then making a u-turn and coming back down, as long as it can drainon both sides, which this can.
Can anyone verify this layout is O.K.?
The ground rough for the full bath in the basement already exists, and is shown in sketch.
From what I am reading in the IRC, there is nothing I can find that specifically disallows a vent going up, then making a u-turn and coming back down, as long as it can drainon both sides, which this can.
Can anyone verify this layout is O.K.?