    I'm now running the septic line 150' from the apartment to the main septic tank. Rented the trencher made a nice ditch and ready to lay pipe. My drop is on the money thanks to a friend with a transit system. The bottom of the trench solid sandstone, just soft enough to scrape a shovel full.

    Now the problem, it poured rain and the trench filled with water (40' 2-10" deep) toward the end where I have not finished the ditch to the tank. I dug a drain ditch and the water ran out but the bottom is mud! The weather is nice today and starting to dry it but may rain again soon. I have room to raise the entire run up a few inches, can I just add gravel to make the bottom solid so I can finish installing or do we have to wait until the mud drys completely? Thanks in advance for any and all advice.

  2. #2
    General Engineering Contractor ballvalve's Avatar
    Join Date
    Dec 2009
    Location
    northfork, california
    Posts
    3,261

    Default

    Since its not the drain field, just the run to the tank, and sandstone, using heavy wall pipe - not the crap from the dollar store- the pipe should bed in the sand mud fine. I would leave it open for as long as possible, and consider some sort of swing joint or slip connector to allow for settling later. You might want to pour a thrust block near the bottom of the run also to help with future movement. And spend a little money on access chambers at critical joints and 'D' boxes and cleanouts. Nothing worse than hidden septics.

  3. #3
    DIY Junior Member DIY Ray's Avatar
    Join Date
    Feb 2012
    Location
    Asheville, NC
    Posts
    7

    Default

    Thanks for the advice. The trench dryed out very well and only ended up with skim coat of mud thanks to the sandstone bottom. I am putting cleanouts every 40'. Dry fit all the pipe yesterday and in runs perfectly. I used all schedule 40 pvc so it seems strong and solid. I drilled a 4" hole in a 12" concrete wall to connect to the apartment. Is it okay to run the schedule 40 thru the hole alone or should I use some sort of sleeve?

  4. #4
    General Engineering Contractor ballvalve's Avatar
    Join Date
    Dec 2009
    Location
    northfork, california
    Posts
    3,261

    Default

    If really on a solid bottom, no. If settling possible use a rubber sleeve of sorts...

Similar Threads

  1. Gravel fell in stool line
    By BenWara in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 3
    Last Post: 03-02-2011, 07:46 PM
  2. Septic line DIY replacement
    By JAR8832 in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 14
    Last Post: 10-20-2009, 07:10 PM
  3. Adding a cleanout to septic line
    By JAR8832 in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 1
    Last Post: 08-30-2009, 01:23 PM
  4. I want to add a new toilet line to my septic
    By Wayne67vert in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 9
    Last Post: 08-25-2008, 06:44 AM
  5. Drain Line for septic - DIY?
    By jbgies in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 3
    Last Post: 07-15-2008, 03:42 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •