Hi folks -
I'm on a project where the homeowner had a tiled bathroom floor that "crunched". The floor was over a 6" high dirt crawl space. I ended up taking out everything down to the floor joists. The extent of the demolition is in the pic below.
During the demo phase, I removed 4 hex-head "screws" from the toilet flange, thinking they anchored the flange to the subfloor. Turns out they were bolts and washers, not screws, and they weren't anchoring the flange at all. Are they for a compression-type cast iron flange? If so, can I just re-tighten the bolts, or did I compromise the flange by removing them?
Also - I don't see any holes in the flange for screwing it to the subfloor. Is this possible or am I just not seeing them? Do cast iron flanges need to be screwed down or are they solid enough that they stand on their own?
Thanks
I'm on a project where the homeowner had a tiled bathroom floor that "crunched". The floor was over a 6" high dirt crawl space. I ended up taking out everything down to the floor joists. The extent of the demolition is in the pic below.
During the demo phase, I removed 4 hex-head "screws" from the toilet flange, thinking they anchored the flange to the subfloor. Turns out they were bolts and washers, not screws, and they weren't anchoring the flange at all. Are they for a compression-type cast iron flange? If so, can I just re-tighten the bolts, or did I compromise the flange by removing them?
Also - I don't see any holes in the flange for screwing it to the subfloor. Is this possible or am I just not seeing them? Do cast iron flanges need to be screwed down or are they solid enough that they stand on their own?
Thanks