    Default Wrong morter mix on pre pitch

    This is my first try at a shower rebuild. I removed a fiberglass 1 piece to replace with rain shower.
    I was so proud of the preparation, blocking, slope to the drain etc. But, I misinterpreted the mix for the pre slope. I used a 4:1 mix of morter & sand. I know now that it should have been potland cement and sand. It has been 2 days & it either is drying very very slow, or it is never going to dry. I can sweep sand off the top forever. After two days, I can walk on it, but it will still gouge out with any object. I think I know how this is going to go with you guys, so lets just get it over with.......

    Thanks in advance,

    Joe

  2. #2
    ACO Shower Drain Sales johnfrwhipple's Avatar
    Join Date
    Jul 2009
    Location
    North Vancouver, BC
    Posts
    2,981
    Blog Entries
    5

    Default

    Quote Originally Posted by onedotlow View Post
    This is my first try at a shower rebuild. I removed a fiberglass 1 piece to replace with rain shower.
    I was so proud of the preparation, blocking, slope to the drain etc. But, I misinterpreted the mix for the pre slope. I used a 4:1 mix of morter & sand. I know now that it should have been potland cement and sand. It has been 2 days & it either is drying very very slow, or it is never going to dry. I can sweep sand off the top forever. After two days, I can walk on it, but it will still gouge out with any object. I think I know how this is going to go with you guys, so lets just get it over with.......

    Thanks in advance,

    Joe

    Sorry to hear about your shower floor.

    The proper mix for a dry pack is 4-5 parts clean washed sand and 1 part Portland Cement.

    Mapei sells a ready mix which is just called 4-1. It is much stronger if you add the ad-mix for it.

    Dry Pack can be walked on easily the next day and often sand can be swept off to a point. Sound like to me that you used either a ready made mortar mix (or thinset) and sand so your ratio of sand to cement is more like 16-1 which is not going to cut it I'm afraid.

    Mixing dry pack is an art and you need to ensure you do it right. It is often advertised as an easy process but it is not if your not familiar with good mixing techniques or if you have limited tools at your disposal. A garden hoe and a clean wheelbarrow can pull it off. Best to make a small sample batch and hone your mixing skills before you go all in on your shower build. Dry Pack's should be 1 1/2" at the thin set point and reinforced with stucco mesh or the like. The should not bite into a wooden sub floor so a slip joint should be used. The heights and approaches vary depending on wood or concrete assemblies so check the TCNA, TTMAC or ANSI specifications for the right set up for your home.

    We like to dry mix the sand and the cement very well. Take half the product and mix it on the wet side. Then we slowly add in the dry product until we have a good dry pack mix to work with.

    Last year I started using mapei's Mapecem Fast Setting Screed Mortar and this is an amazing product. Just add water and mix. It is wetter than drypack and more user friendly. It can be covered with a sheet membrane the next day 14-16 hours.

    Love the stuff.

    JW
    Last edited by johnfrwhipple; 02-29-2012 at 07:09 AM.


    jfrwhipple@gmail.com - www-no-curb.com - 604 506 6792

    Always get construction advice double checked by your local city hall. Flood Test Every Shower - Every Time.

  3. #3
    Homeowner
    Join Date
    Jan 2010
    Location
    Alabama
    Posts
    1,174
    Blog Entries
    1

    Default

    Quote Originally Posted by onedotlow View Post
    This is my first try at a shower rebuild. I removed a fiberglass 1 piece to replace with rain shower.
    I was so proud of the preparation, blocking, slope to the drain etc. But, I misinterpreted the mix for the pre slope. I used a 4:1 mix of morter & sand. I know now that it should have been potland cement and sand. It has been 2 days & it either is drying very very slow, or it is never going to dry. I can sweep sand off the top forever. After two days, I can walk on it, but it will still gouge out with any object. I think I know how this is going to go with you guys, so lets just get it over with.......

    Thanks in advance,

    Joe
    I'd re-do it. Sounds like your a guy that likes to do things right also.

  4. #4
    onedotlow onedotlow's Avatar
    Join Date
    Feb 2012
    Location
    Rowlett, TX
    Posts
    2

    Default

    I ripped it all out. It didnt take long. If anyone needs my wife`s recipe for sugar cookies, I think I have found it.........

    Joe

Similar Threads

  1. Tile morter removal
    By r_2016 in forum Shower & bathtub Forum & Blog
    Replies: 6
    Last Post: 04-25-2010, 12:40 AM
  2. Brick & morter & How to clean off morter???
    By dgold in forum Remodel Forum & Blog
    Replies: 9
    Last Post: 06-19-2009, 05:45 PM
  3. Tub pitch
    By vman in forum Shower & bathtub Forum & Blog
    Replies: 2
    Last Post: 03-29-2009, 08:25 AM
  4. Pitch and clearance of PVC
    By jar546 in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 14
    Last Post: 02-26-2008, 11:08 AM
  5. basement bathtub install - morter patch
    By nayte in forum Shower & bathtub Forum & Blog
    Replies: 2
    Last Post: 01-28-2008, 09:08 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •