The trap arm on the shower needs to be nearly level before the vent.
You are allowed 1/4" per foot grade, up to five feet before it's vented with the Uniform Plumbing Code, which is used in Oregon.
Therefor, it would be the top drawing.
A wet vent needs to be a minimum of 2", which you have now as the toilet vent.
![]()





Reply With Quote

Bookmarks