Every manufacturer of PEX tubing specifies an air or water test, they range from 30 to 100lbs/sq.in. and the test may last five minutes to 24 hours, you should use the manufacturer's spec but for my radiant floor heating installations here in Minneapolis I generally use 60#/24hrs. or 100#/15 minutes. Please do not leave 100# pressure on the system while pouring cement or gypsum based products or in any case leave the high pressure test unattended.





Reply With Quote
Bookmarks