Hello,
I'm roughing in a toilet and two sinks in the upstairs of my shop. The sinks will share a common wall (one in bathroom one for bar).
I will have a small WH (4gal) that will likely be in a cabinet under a sink. I have 3/4" PEX stubbed in downstairs wall. I figured on installing a shutoff where it enters shop and continuing with 3/4" PEX up through framing and through attic of shop which would amount to 10 vertical feet and about 40 horizontal feet.
From here, I'm trying to figure out the best way to plumb with hot water to 2 sinks and cold to both plus a toilet.
-Should WH be before a manifold or one branch off of it?
-Should I just skip manifold and just 'T' off of main line to catch both sinks, WH and toilet?
Water demand should be pretty low. I am probably over analyzing this whole project. My next over analyzation will be with the waste pipes...coming soon.
Thanks for any help.
Nick
I'm roughing in a toilet and two sinks in the upstairs of my shop. The sinks will share a common wall (one in bathroom one for bar).
I will have a small WH (4gal) that will likely be in a cabinet under a sink. I have 3/4" PEX stubbed in downstairs wall. I figured on installing a shutoff where it enters shop and continuing with 3/4" PEX up through framing and through attic of shop which would amount to 10 vertical feet and about 40 horizontal feet.
From here, I'm trying to figure out the best way to plumb with hot water to 2 sinks and cold to both plus a toilet.
-Should WH be before a manifold or one branch off of it?
-Should I just skip manifold and just 'T' off of main line to catch both sinks, WH and toilet?
Water demand should be pretty low. I am probably over analyzing this whole project. My next over analyzation will be with the waste pipes...coming soon.
Thanks for any help.
Nick