I am having a plumber come and replace the cast iron flange in our house once our floor is in. Old was cracked, he chiseled off all of it. Right now just the pipe in the floor, we are now replacing the floor with a new tile floor. I am at the stage of laying down the cement board and was wondering how much space I need to give him around the stack to be able to put in the new flange.
Wasn't sure if it went on the inside or outside.. And I don't want him to have to start breaking away tile on the new floor if I got too close. At this point if I needed to cutaway some of the plywood subfloor to give him a little more room around it would be easy, just don't want him smacking away at the tile after I finish up.
Thanks for your time.
Wasn't sure if it went on the inside or outside.. And I don't want him to have to start breaking away tile on the new floor if I got too close. At this point if I needed to cutaway some of the plywood subfloor to give him a little more room around it would be easy, just don't want him smacking away at the tile after I finish up.
Thanks for your time.