The lower plate is at the lowest point where you will be installing the pre-slope.
The top of the lower portion accepts the water at it's lowest point.
The two pieces, top and bottom clamp together and seal it.
The ABS can be embedded in the concrete.





Reply With Quote
Bookmarks