I am going to install a 3/4 bath in my basement and the plumbing is already stubbed out. I was wondering if it is recommended that I install the fixtures directly on the concrete or build up a subfloor. Also, do I need to place the shower stall directly over the drain pipe or is there enough room under a shower stall floor to move it to the side some?