I am building a 2.5' height (in total, 6" of the 2.5' will be burried, so only about 2' are above the ground), 75 feet long, 1 foot thick dry stack retaining wall now.
I have done the footing and first course. The base and the first course are about 18" width. The base is about 4" crushed stone.
please have a look to see is there anything is not good enough? do I have to fill in those holes with crushed stone after the first course?
thanks,
I have done the footing and first course. The base and the first course are about 18" width. The base is about 4" crushed stone.
please have a look to see is there anything is not good enough? do I have to fill in those holes with crushed stone after the first course?
thanks,