Here is my gutted bathroom. I have a left-hand-drain Kohler Villager cast iron tub (with apron) that I want to install along the far wall (i.e. along the wall that has exposed insulation):
The tub is 60" long and the available space is 78" (with a downward-sloping ceiling).
Questions:
1) Do I install the tub (on a ledger board) *before* building a pony wall along the non-drain end of the tub? Or do I build the short (20" 2x6) pony wall first?
2) I plan on installing a heated tile floor. Because the room has some funny angles (not visible in the picture), I was going to run my own heating cables and then pour Self-Leveling Cement. Do I run the cables and pour the whole floor *before* installing the tub? Or do I put in the tub first and then pour SLC on the remaining area? (The heating cable would only be under the exposed tiles, not the tub). My concern is the joint between the tub & SLC, and the reduction of tub-height -- it's only 14" to start with.
This is my first bathroom reno, so I'd appreciate any tips.
Thanks!
.../j
The tub is 60" long and the available space is 78" (with a downward-sloping ceiling).
Questions:
1) Do I install the tub (on a ledger board) *before* building a pony wall along the non-drain end of the tub? Or do I build the short (20" 2x6) pony wall first?
2) I plan on installing a heated tile floor. Because the room has some funny angles (not visible in the picture), I was going to run my own heating cables and then pour Self-Leveling Cement. Do I run the cables and pour the whole floor *before* installing the tub? Or do I put in the tub first and then pour SLC on the remaining area? (The heating cable would only be under the exposed tiles, not the tub). My concern is the joint between the tub & SLC, and the reduction of tub-height -- it's only 14" to start with.
This is my first bathroom reno, so I'd appreciate any tips.