Polecatt
Member
Hello! First time poster here looking for some of the excellent ideas I have seen browsing through the site...
I have a 2" drain pipe rough in through my new slab but unfortunately it is off where it needs to be. Based on the picture attached, the pipe needs to be 1/4" to the right and 1/8" down.
Based on the OD of the 2" pipe, perfectly centered would have a half inch on all sides of the pipe. The opening in the shower base is 3 3/8"
Any thoughts on what I need to do to get this connected?
P1050120 by polecatt, on Flickr
I have a 2" drain pipe rough in through my new slab but unfortunately it is off where it needs to be. Based on the picture attached, the pipe needs to be 1/4" to the right and 1/8" down.
Based on the OD of the 2" pipe, perfectly centered would have a half inch on all sides of the pipe. The opening in the shower base is 3 3/8"
Any thoughts on what I need to do to get this connected?
P1050120 by polecatt, on Flickr