To concrete or to not concrete!

Users who are viewing this thread

Bradlf

New Member
Messages
2
Reaction score
0
Points
0
I'm installing a whirlpool tub where a shower use to be on a concrete slab. We had to move the previous drain by jackhammering, have now installed the drain. We have concreted all but the 8" x 14" hole for the drain connection. Now that I've finished the drain plumbing and tested it - should I concrete the remaining hole? I am leaning toward just filling it in with sand.
Brad
 

Jeffreyhel

New Member
Messages
60
Reaction score
0
Points
0
fill it with sand until you get within one inch of the top and cement the reset. This way you will keep out bugs and maybe some ground water.
 

Gary Swart

In the Trades
Messages
8,101
Reaction score
84
Points
48
Location
Yakima, WA
I think I'd use patching concrete probably more like 3" or 4" on top of the sand. Reason for the patching concrete is that since it contains no rock, it would be much easier to chip out if needed.
 

hj

Master Plumber
Messages
33,603
Reaction score
1,042
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
cement

Our "inspectors" are worried about gophers digging under the house and getting under the tub, so we have to concrete the hole. It just takes a thin coating of mortar, concrete, or whatever.
 

Bradlf

New Member
Messages
2
Reaction score
0
Points
0
Cement

Thanks guys - it's nice to know the right thing to do and the reason!
Brad
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks