Your sandwich system adds 3"+ to the floor. Are you ok with lowering your ceiling height that much? You show hot water heat, Where are you planning to get the hot water?
This is a job for a reliable heating contractor. He will figure out how many total btu are needed for your house, and design the zones. I am guessing your house does not have the insulation factors shown in that diagram.





Reply With Quote

Bookmarks