Best guess on my part is that the pipes need to be taken out, from the bottom, then the drain/vent taken out as well, remove the rotten wood, drill holes in the new piece with a hole saw, shove it in there and nail it down from the vertical 2x4's, then run the pipes back in. Also put that backing piece back up where it belongs.
I'm not sure where the best place is to cut the PVC. As for the copper pipe, I'd imagine it would be best to remove it by heating up the elbow that sits below the floor. When I put it back I might need to use a rubber coupler depending on where the PVC gets cut from.
Thoughts?