    WHen building the waterproof membrane layer on a pres sloped slab, how thick does the setting bed need to be? I found in a B & D tile book, they say have two layers on top with lathe in between, is that only for wood floor applications? And is the deck mud available ready for h2o & mixing? As I understand it, I will be skipping steps 1 & 2............since the slab is presloped to the proper angle. I also plan to use a liquid membrane on the walls(cement board) before I start tiling them.
    Many Thanks

    Basically, a traditional shower pan is composed of 5-layers (well, six if you consider the first):
    1 - a bonding agent to make sure the next layer sticks to the slab
    2 - deck mud (mix of sand and portland cement) shaped with the proper pitch to the drain at 1/4" per foot from the longest distance. This can get messy if the drain isn't centered.
    3 - the liner
    4- the setting bed - another layer of deck mud (actually parallel to the sloped layer - i.e., equal thickness)
    5 - thinset to hold the tile down
    6 - finished tile.

    There are also special considerations to ensure the curb remains waterproof and you can tile it. Over concrete it's good to use bricks or pavers to make the curb rather than wood, which is often used over a wooden subfloor.
    Last edited by MrJuicy; 02-19-2011 at 02:26 PM.

  2. #2
    Plumbing Contractor Will Rogers Plumbing's Avatar
    Join Date
    Oct 2010
    Location
    Moore, Ok
    Posts
    49

    Default

    If you could be a little more clear on what you are doing I could help you out.

    Based of your post.

    1. when setting a mud bed on a slab you don't need a bonding agent. Just clean up concrete well with water and sponge then apply thinset to the concrete and put the deck mud on the wet thinset. But in all honesty, that would be over kill. Just pack the deck mud right on the concrete.

    2. yes you do want to have 1/4" per foot slope. I make the pre slope atleast 3/4 inch think.

    3. correct, pvc liner goes on top of the pre slope

    4. the final layer of deck mud should be thicker than the pre slope.

    5. correct

    6. correct

    Wall and Curb mud is not deck mud. It's call "fat mud" and is mixed with lime to give it more cling.

    Hard to tell if your asking or give advice...
    Will Rogers Plumbing
    Moore, Oklahoma

    http://www.willrogersplumbing.com/

  3. #3
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,434

    Default

    You can use thinset as a bonding agent, or just mix some portland cement up as a slurry and paint or trowel it on. It does help.

    You want your setting bed to be around 1-1.25" thick so it has some strength. Keep the weepholes clear so it can drain (unless using a surface membrane, which you don't appear to be doing). No need for lath over a concrete slab, although you'd normally use some over the curb. If you use a surface membrane (Hydroban or Kerdi for example), you only need one layer of deckmud.

    You can buy sandmix, but it is generally about 3:1 sand:cement, and it works better if it is closer to 4-5:1. The more portland cement, the stickier it is, the harder to get it to slope and pack, and it can shrink and crack more easily than when you have more sand. Don't mix it too wet, either. It should be wet enough where you can grab a handfull, squeeze it into a lump without water dripping out, and have it stay together when you let go. If it doesn't stay together, it's not wet enough. If it drips, it has too much water. You need to use something like a hoe or rake to mix it up...you can't reliably mix it with a drill and paddle like you can with thinset.
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

  4. #4
    ACO Shower Drain Sales johnfrwhipple's Avatar
    Join Date
    Jul 2009
    Location
    North Vancouver, BC
    Posts
    2,993
    Blog Entries
    5

    Default

    Post(s) deleted by John Whipple
    Last edited by johnfrwhipple; 03-18-2014 at 08:31 AM.


    jfrwhipple@gmail.com - www-no-curb.com - 604 506 6792

    Always get construction advice double checked by your local city hall. Flood Test Every Shower - Every Time.

  5. #5
    DIY Junior Member MrJuicy's Avatar
    Join Date
    Feb 2011
    Location
    Holladay, Tn.
    Posts
    2

    Default More helpful information:

    Quote Originally Posted by jadnashua View Post
    You can use thinset as a bonding agent, or just mix some portland cement up as a slurry and paint or trowel it on. It does help.

    You want your setting bed to be around 1-1.25" thick so it has some strength. Keep the weepholes clear so it can drain (unless using a surface membrane, which you don't appear to be doing). No need for lath over a concrete slab, although you'd normally use some over the curb. If you use a surface membrane (Hydroban or Kerdi for example), you only need one layer of deckmud.

    You can buy sandmix, but it is generally about 3:1 sand:cement, and it works better if it is closer to 4-5:1. The more portland cement, the stickier it is, the harder to get it to slope and pack, and it can shrink and crack more easily than when you have more sand. Don't mix it too wet, either. It should be wet enough where you can grab a handfull, squeeze it into a lump without water dripping out, and have it stay together when you let go. If it doesn't stay together, it's not wet enough. If it drips, it has too much water. You need to use something like a hoe or rake to mix it up...you can't reliably mix it with a drill and paddle like you can with thinset.
    Thanks for you help, I assume thinset as a bonding agent, is to secure the vinyl membrane in place on the slab?
    If need be, I will add more portland cement, by weight, to the sand mix purchased from L's.
    THe clamping drain is positioned to be level with the concrete @ the fixed flange, to prevent covering the weepholes do I stop the setting bed layer at the flange?
    I can increase the slope when applying the setting bed if need be(?) since I am framing the walls up to my needs.
    The membrane was purchases at THDepot but they do not carry the inside curb corner cover as I have seen in tile books.
    I am thinking I will apply two coats of Rd Guard to those areas to seal them, while applying it to the cement board on the inside walls.
    On the curb, do I form the lathe & lay it directly on the membrane then apply the deck mud layer?
    THe preslope is 4" thick, is making the final layer that thick, really needed?

    Again, many thanks for all the help & I am asking for advice.........*S*
    I will add a pic as soon as I have the walls framed up.

  6. #6
    Plumbing Contractor Will Rogers Plumbing's Avatar
    Join Date
    Oct 2010
    Location
    Moore, Ok
    Posts
    49

    Default

    another thing you may not know, but if your doing a surface applied membrane(kerdi, hydro ban/barrier, etc) then you won't want to use a standard fha shower drain. There is a way to use a standard drain with surface membrane, but it would most likly be out of your league.
    Will Rogers Plumbing
    Moore, Oklahoma

    http://www.willrogersplumbing.com/

  7. #7
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,434

    Default

    If you are going to lay the liner on the sloped concrete floor, then you do not need any bonding agents at all and neither of those would work on the liner anyway. Lay it down, fold the corners and get it as smooth as you can (when you pack down the deck mud, this should flatten it out). If you make it the 1-1.25" thick, you'll have plenty of weight on it to hold it in place. Tack it up on the walls only on the upper edges (above the curb height) so you don't compromise it. If making a curb, use the corners and glue them in place with the special glue.

    You have the items wrong...the sand mix is mostly sand. The prepared bags of sand mix have too much portland cement in them, you need to add more SAND, not cement to lean it out. This makes it a bit more porous, less sticky, and it packs and smooths better. Plus, it isn't as likely to shrink and crack as when it has more cement in it. IOW, a 3:1 sand mix from the bag needs more sand to make the ratio closer to 4:1 or 5:1 (sand/cement).
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

Similar Threads

  1. How to locate a pipe leak on sloped driveway?
    By ballvalve in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 14
    Last Post: 11-09-2010, 07:17 PM
  2. Sloped ceiling insulation
    By Kubismo in forum Remodel Forum & Blog
    Replies: 13
    Last Post: 10-21-2010, 03:58 PM
  3. vertical drain or sloped?
    By mccm in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 11
    Last Post: 12-22-2009, 09:49 AM
  4. rainfall showerhead in sloped ceiling...
    By nrcurcio in forum Shower & bathtub Forum & Blog
    Replies: 2
    Last Post: 04-10-2006, 08:21 PM
  5. how to deal with sloped tile flange in tub
    By jthoni in forum Shower & bathtub Forum & Blog
    Replies: 2
    Last Post: 05-22-2005, 02:50 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •