I'm in process of a bathroom remodel and just had the plumber move the shower drain to its new location. The substrate was just laid down. I looked through the hole for the shower drain and saw the p trap was the kind with the compression nut and not a cement join type. . Is there any increased chance of leaks with the compression type? Is it worth pulling the substrate to put in the cement type? If not, should it be hand tightened or should it be snugged up with a channel locks?
Thanks in advance for the advice
Thanks in advance for the advice