I have no experience in this area and am looking around for info. I'm remodeling a laundry room on the first floor and installing a bathroom directly over it on the second floor. I don't want to finish the bathroom now, just do the rough in. I have 7" of clearance under the floor for the bathroom plumbing and the floor is going to be about 1.5" thick finished. The preliminary questions are.
1. Do I have enough room under the floor for the toilet plumbing?
2. Will a 45 degree closet flange help?
3. If the flange should sit on top of the finished floor and I don't want to install the floor now how do I mount the flange?
4. What type of Tee is required?
5. Can I connect a shower, a toilet, and a sink (from the bath) and a sink and a washer (from the laundry room) to the same 3" drain?
Thanks all for the help.
1. Do I have enough room under the floor for the toilet plumbing?
2. Will a 45 degree closet flange help?
3. If the flange should sit on top of the finished floor and I don't want to install the floor now how do I mount the flange?
4. What type of Tee is required?
5. Can I connect a shower, a toilet, and a sink (from the bath) and a sink and a washer (from the laundry room) to the same 3" drain?
Thanks all for the help.