Hello,
I'm renovating my 2nd floor bathroom and taking out all the old plumbing and redoing everything. I wanted to make sure i am doing it correctly and using proper tees and wyes etc. Please see pic below. Main pipe to septic is 4", which goes to 3" in bsmt, then up to 2nd floor bath. Sink on main level drains directly to 4" and has no vent. See in pic where 3" comes up from bsmt, I need to know proper way to tie in wc, bath, and 2 sinks, with vent and drain. I'm hoping to make 90 from 3" coming from bsmt, feed the 3 fixtures and then switch to 2" after toilet and up outside wall, then 45 up to existing hole in roof. Is this feasible, and how? I'm in ontario, canada. Thanks for the help.
I'm renovating my 2nd floor bathroom and taking out all the old plumbing and redoing everything. I wanted to make sure i am doing it correctly and using proper tees and wyes etc. Please see pic below. Main pipe to septic is 4", which goes to 3" in bsmt, then up to 2nd floor bath. Sink on main level drains directly to 4" and has no vent. See in pic where 3" comes up from bsmt, I need to know proper way to tie in wc, bath, and 2 sinks, with vent and drain. I'm hoping to make 90 from 3" coming from bsmt, feed the 3 fixtures and then switch to 2" after toilet and up outside wall, then 45 up to existing hole in roof. Is this feasible, and how? I'm in ontario, canada. Thanks for the help.