vman
New Member
I have a 3 fam I'm doing over.
The service main coming from the street looks to be 3/4 and looks like it is downsize into a 5/8 meter.
Currently out the meter is 1/2 inch which is feeding 3 kitches (just sinks) and 3 full baths and 3 washers.
I want to replace the 1/2 inch. One plumber suggested 1 inch. I was just thinking of going 3/4. Does 1 inch make sense coming off of a 5/8 meter?
The service main coming from the street looks to be 3/4 and looks like it is downsize into a 5/8 meter.
Currently out the meter is 1/2 inch which is feeding 3 kitches (just sinks) and 3 full baths and 3 washers.
I want to replace the 1/2 inch. One plumber suggested 1 inch. I was just thinking of going 3/4. Does 1 inch make sense coming off of a 5/8 meter?