    Default Sub floor sequencing

    New Home Construction....My question is , Do you place the subfloor (ply ,cement board etc) down before you place the tub? ..ie..tub on top of ply and cement board. Also in regards to tiling, Do you tile the floor first and then place the cabinents(bath,kitchen) on top of the tile? Great site ..thanks

  2. #2
    DIY Junior Member jc60618's Avatar
    Join Date
    Dec 2009
    Location
    Chicago
    Posts
    88

    Default

    Yes you place the subfloor first then set the tub. Otherwise the tub will be sitting right on top of the joist rather than the subfloor. Also it is better to tile the room first then set the cabinets. If you set the cabinets first then tile, you will be spending more time cutting the tiles to accomodate the perimeter of the cabinets.

  3. #3
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,447

    Default

    No need for cbu under the tub. You might want to put an extra layer of ply there to bring the tub closer to the level of the tile. Assuming it has an attached finished panel, you may not want it burried too far beneath the floor. Make sure you follow the instructions on the cbu installation: thinset it down, and screw (or nail with dipped, not electroplated galvanized nails). Before or while you set the tile, use the special alkalai resistent mesh tape on the seams. If you do it while tiling, you won't end up with 'speed bumps'. If you are using a very expensive tile, you could avoid them under the vanity, but if you ever remodel, and don't want to change the floor, you'll wish you did! Also, the toilet flange should be on TOP of the finished floor. if you notch the tile prior to setting it, you won't have to drill holes to anchor the flange to the subflooring. If you are thinking about a stone tile, you need a second layer of plywood before the cbu, at least 3/8" thick, no 'D' sides. Check out www.johnbridge.com for help with tiling.
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

  4. #4
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    25,687

    Default

    Unless you enjoy making precise cuts to fit the subfloors to the tub, install it first, then the tub, then tile up to the tub.

  5. #5

    Default

    Looking at your sequencing I don't see any waterproof pieces in there, are you planning on using something like Durock Tile Membrane? It is a moisture-proof barrier that looks like it could be great for bathroom and basement tile projects. Durock Tile Membrane is fast curing and easy to install because it comes on a roll but doesn’t curl back up like you would expect. I think it is an easy and cost-effective addition to any tile project.

    I talked to a real estate friend of mine and she said this type of renovation could help increase the value to you home with just this addition to the project.

    If you are curious check out their website for more information: www.durocktilemembrane.com/?cid=terrylove

    I should say I work with Durock but I thought it might be a good addition to your project. Also, if you find your questions are more nitty-gritty feel free to contact me and can connect you with an expert.

Similar Threads

  1. 2nd Floor Washing Machine Puts Water Into 3rd Floor Sink
    By molo in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 5
    Last Post: 08-12-2010, 10:41 PM
  2. Removing marble tile floor for wood floor
    By m7777777 in forum Remodel Forum & Blog
    Replies: 1
    Last Post: 06-22-2010, 05:07 PM
  3. Installing radiant floor heating under subfloor / hardwood floor.
    By brainbone in forum HVAC Heating & Cooling
    Replies: 15
    Last Post: 03-02-2010, 12:54 PM
  4. 2nd Floor Washer/Waterheater - Overfloor Floor drain tie in.
    By zhomes in forum Plumbing Forum, Professional & DIY Advice, Tips & Tricks
    Replies: 1
    Last Post: 11-20-2007, 12:30 PM
  5. adding floor drain for second floor laundry room
    By illinipdx in forum Remodel Forum & Blog
    Replies: 0
    Last Post: 01-12-2005, 08:51 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •