JFCarbonneau
New Member
We are pouring our foundation walls on this Friday, May 28th and I need to know how to prep the pass-through in the concrete wall for a propane direct-vent Triangle Tube Prestige Excellence PE110 condensing boiler?
Or can it be vented through the rim board between two joists?
Thanks in advance,
JF
Or can it be vented through the rim board between two joists?
Thanks in advance,
JF