We are pouring our foundation walls on this Friday, May 28th and I need to know how to prep the pass-through in the concrete wall for a propane direct-vent Triangle Tube Prestige Excellence PE110 condensing boiler?
Or can it be vented through the rim board between two joists?

Thanks in advance,

JF