alwaysfine
New Member
I am installing a new bathroom in my basement. I have cut the concrete and am now installing all drainage and vent lines but am unsure what the best way is to install the closet flange. I am roughing in all sewage lines now. After all lines are in I will refill dirt and refinish any removed concrete. I will have tile on the floor. Should I set the flange even with my concrete floor prior to tiling? Even with the finished floor after tiling? or just extend the pvc pipe and not finish it until all tile is done and I am ready to set the toilet? Also what do I anchor the flange to? Do I drop in bolts while replacing the concrete or drill out for Tapcons later? Thanks for any help in this area.
Last edited: