We are remodeling and I was wondering what everyone thinks the proper order should be when installing a tile floor and new cupboards.
We will be gutting the kitchen and taking up our wood floor to put in tile. Under the tile I will have electric radiant heat and ditra. Should I have all the put in first or have the cupboards put in first and then the tile? Thanks.
 

hj

Master Plumber
Messages
33,600
Reaction score
1,037
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
Tile first at least to a spot past the cabinets toe space. Then you do not have to cut every tile to fit, and the dishwasher will NOT be too high for the opening. Be sure to tile the entire dishwasher recess.
 

Jadnashua

Retired Defense Industry Engineer xxx
Messages
32,771
Reaction score
1,191
Points
113
Location
New England
Agree! You don't need to tile the entire space underneath the counters, but you may want to place a partial row along the wall so the front and back are at the same height. You can use ply, but getting the height the same can be a pain. You can also shim it with other stuff, but again, it can be a pain. This will also make the counter height "proper"; otherwise, it would be the thickness of the tile short. Not a big deal, except for under counter stuff and maybe slide in things like the stove (they usually have enough height adjustment, but maybe not if it is a particularly thick tile).
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks