Rmelo99
Network Engineer
I'm have the sewer line being replaced on Tuesday. The line is about 9 ft-10ft down. I've rented a sod cutter in an attempt at not losing large parts of the front lawn. I think the guy said the trench has to be about 4ft wide since he has to use a trench box bc of the depth.
My question is how much SOD would you guys say I should cut on either side? I'm guessing there will be lots of dirt that needs to be piled somewhere.
I have about 65-70' of length. So far I have removed about 8ft of width. Is 4ft enough room to pile all the dirt? Is it safe to assume he can limit his pile to one side of the trench?