Should I even mention that my last name is Dutcher? Just saying, lol. Looks I missed some fun while I was out. I had a hell of a time at work with OT and some down HP blade servers, so I'm behind. Anyone need any help with blade servers, SANs, or iSCSI give me a shout. Fun times. But I'm back and I'm still working on this DIY project. I bought some copper and some PVC and stuff this weekend and am begging the test fit stages. Hope to has this all done by the end of next weekend.
Attached I have a photo of a test setup I've done for the drain line. I want to know if this will work or makes sense to do it this way. It's 3/4 PVC coming in from the filter setup. The setup would be about 30 feet back from it and I need to go up and over a joist. I put together 2 45 degree elbows. Will this cause a problem in the drain line or will this work?
I'll be back soon with more test fits. Like, will 3/4 PEX give me the same water pressure as 3/4 copper or CPVC?





Reply With Quote

Bookmarks