Steelers Fan
In the Trades
got a job today with a master plumber doing service work,so im kinda happy.But at the same time seeing the quality(or lack thereof expected)Im very dissapointed.Not saying im some fantastic plumber since ive done new construction pretty much exclusively,but this really suxx a$$.this guy does not beleive in soldering,takes too long and sharkbites are the shiot,caught me
reaming what little copper was allowed today and told me that takes too long dont do that.slapped a replacement 50 gallon gas water heater in today in 30 minutes and no time to test it for leaks just slap it in and go.Then did a k.s. snake job,guy had 1 generic sewer machine and 1 friggin head/cutter not several ,it was all galvy and the cutter was so big it wouldnt even make the first turn through the san-t ,pulled the head and sent the cable only down and then took my channel locks and tried to squish it down a little(c shaped cutter head) to make it past and he said dont worry about it carry your a$$ and collect the moolah.Now dont get me wrong,I know im union trained and i try to do it right the first time,but i know how to cut corners a little while still trying to do a quality job but this just sucks.Quantity and shoddy workmanship to make the mo$te$t screw quality.I seriously hope work picks up for our hall so i can get back to work and actually be proud of the job I'm doing.
reaming what little copper was allowed today and told me that takes too long dont do that.slapped a replacement 50 gallon gas water heater in today in 30 minutes and no time to test it for leaks just slap it in and go.Then did a k.s. snake job,guy had 1 generic sewer machine and 1 friggin head/cutter not several ,it was all galvy and the cutter was so big it wouldnt even make the first turn through the san-t ,pulled the head and sent the cable only down and then took my channel locks and tried to squish it down a little(c shaped cutter head) to make it past and he said dont worry about it carry your a$$ and collect the moolah.Now dont get me wrong,I know im union trained and i try to do it right the first time,but i know how to cut corners a little while still trying to do a quality job but this just sucks.Quantity and shoddy workmanship to make the mo$te$t screw quality.I seriously hope work picks up for our hall so i can get back to work and actually be proud of the job I'm doing.