I used 3" rigid metal duct for the whole run except for going between the roof and the top plate on the wall. In that 1' length I used flex because the opening was almost 3" tall but you need to make an immediate turn down to the soffit. I would not cut into the plate. I even tried to use a metal elbow but it would not quite fit and you can't squeeze them without failure. Not sure how yours looks though.





Reply With Quote
Bookmarks