Hello -
Thank you in advance for all of the answers I have gotten to date without posting, you are all a wealth of knowledge.
Now for my newest problem. I have a ~120 year old house that I just removed a cast iron tub from. The floor it was on is about 1 1/2 - 1 1/4 below the "new/existing" floor. I realize the new tub can be below the floor by a bit but I was wondering if I could build it up with plywood etc. most of the way and then use some sort of floor leveler etc. to make that area flush with the existing sub floor?
Thanks again.
Thank you in advance for all of the answers I have gotten to date without posting, you are all a wealth of knowledge.
Now for my newest problem. I have a ~120 year old house that I just removed a cast iron tub from. The floor it was on is about 1 1/2 - 1 1/4 below the "new/existing" floor. I realize the new tub can be below the floor by a bit but I was wondering if I could build it up with plywood etc. most of the way and then use some sort of floor leveler etc. to make that area flush with the existing sub floor?
Thanks again.