    Putting in a bathtub for my daughter, house is 60 years old at least. Floor from wall is out of level by about 3/4" in the 5 foot area where the tub will sit. How should I level the floor and what would you use. If I had the time and money I'd like to see the center beam jacked up but i don't. House is a old balloon framed house, one story with full basement with a very low ceiling. Wish I had my camera with me. Any and all help is welcomed.

  2. #2
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    25,655

    Default tub

    IF it is out of level in that direction, it must mean the joists are parallel to the front of the tub, so you cannot recess the tub into the sub floor and let the high end rest on the joists. Therefore, your only solution may be to level the tub after setting it on the subfloor and then raising the floor 3/4" to close the gap at the low end.

  3. #3
    DIY Member psjr56's Avatar
    Join Date
    Apr 2009
    Location
    S. Jersey
    Posts
    40

    Default

    Quote Originally Posted by hj View Post
    IF it is out of level in that direction, it must mean the joists are parallel to the front of the tub, so you cannot recess the tub into the sub floor and let the high end rest on the joists. Therefore, your only solution may be to level the tub after setting it on the subfloor and then raising the floor 3/4" to close the gap at the low end.
    HJ, What would I raise the floor with?

  4. #4
    Moderator & Master Plumber hj's Avatar
    Join Date
    Aug 2004
    Location
    Cave Creek, Arizona
    Posts
    25,655

    Default floor

    A sheet of 3/4" plywood against the edge of the tub. The floor would still be off level, but there is nothing you can do about that without jacking the house up.

  5. #5
    Retired Defense Industry Engineer jadnashua's Avatar
    Join Date
    Sep 2004
    Location
    New England
    Posts
    21,412

    Default

    Leveling the tub is important for proper draining, and keeping water from pooling, and maybe end up rotting things because they stay damp.

    My whole downstairs was unlevel, and I went the route of stripping all of the subflooring off, planing and shimming the joists, then installing new subflooring. it was a major effort, but with the use of a laser level and time, the whole floor is level to within about 1/8" across the full surface.

    If you strip the subflooring off, you could sister new joist segments onto them that are now level, then put new subflooring down on the sisters. this would make installation of the tub, vanity, toilet, and tile, if desired, in the remodel project much easier. the biggest problem comes in a big transition out of the bathroom into the hallway. I redid my upstairs bathroom, and installed pex in a pretty thick bed of slc for radiant heat. this raised the floor easily 1.5", and I don't find the transition to the hallway a problem. I happened to have some stone saddles made that matched the granite counter, but it could also be done with wood or other materials.

    If you can live with just the tub level, you could set it in a mortar mix, or choose stuctolite.
    Jim DeBruycker
    Important note - I'm not a pro
    Retired Defense Industry Engineer; Schluter 2.5-day Workshop Completed 2013, 2014

  6. #6
    DIY Member psjr56's Avatar
    Join Date
    Apr 2009
    Location
    S. Jersey
    Posts
    40

    Default

    I have a bag of stuctolite but I'm not sure what to do with the front edge. She'll have to live with just the tub level, way to much work to releveling that old house.