bigwooo
New Member
I plan to install Uponor pex fittings, pipe, and manifolds using a home run system. I'm building in Mexico where there are no PEX experts, myself included.
The floor and ceiling will be concrete. Walls 8" block. I have a couple of questions/need advice:
1. From what I understand Pex can be poured directly into concrete, but it will need sleeving and 90 degree supports when it transitions out of the concrete. What type of sleeving should I use? I can't find any on the pex supply sites.
2. The pex supply to the shower valves/heads and up to the second story will be run through the concrete floor, then up through a hollow cell in the cinder block to the second story. I can't determine what to use to secure the pex inside the block cell (that can be attached to the block within the limited space available to work inside the cell), any suggestions?
3. Should I sleeve the pex in the hollow cell of the concrete block to protect it from the rough surface?
The floor and ceiling will be concrete. Walls 8" block. I have a couple of questions/need advice:
1. From what I understand Pex can be poured directly into concrete, but it will need sleeving and 90 degree supports when it transitions out of the concrete. What type of sleeving should I use? I can't find any on the pex supply sites.
2. The pex supply to the shower valves/heads and up to the second story will be run through the concrete floor, then up through a hollow cell in the cinder block to the second story. I can't determine what to use to secure the pex inside the block cell (that can be attached to the block within the limited space available to work inside the cell), any suggestions?
3. Should I sleeve the pex in the hollow cell of the concrete block to protect it from the rough surface?