tub installation

Users who are viewing this thread

sumballo

New Member
Messages
1
Reaction score
0
Points
0
My bathroom is stripped to concrete and 2by4s. When installing a new tub, do I first install cement backer boards from floor to ceiling or do I install the new tub first and bring the backer board down to the tub edge? Thanks.
 

hj

Master Plumber
Messages
33,603
Reaction score
1,042
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
tub

Put the tub in first and then bring the walls down to it. Unless your space is larger than most, if you put the backer boards up first the tub would not fit in the space.
 

Jadnashua

Retired Defense Industry Engineer xxx
Messages
32,770
Reaction score
1,190
Points
113
Location
New England
depending on the size of the tile, sometimes it is good to shim the studs above the tub rim out slightly so that the backer board can be brought down over the rim to about 1/4" above the tub surface. Large tile can hang unsupported there, but smaller tile should have the cbu further down. Check out www.johnbridge.com for tiling stuff. Also, put a vapor barrier behind the cbu (cement backer unit). Tar paper or poly works fine, bring it down over the tub flange; cut it off after you get the cbu up. My unprofessional opinion.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks